Difference between revisions of "User:Shraddhanand/ToDo"
From CHG-Wiki
Jump to navigationJump to searchShraddhanand (talk | contribs) |
m |
||
(3 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
This page lists Shrad's work plan and task completed for each month starting from May 2014. | This page lists Shrad's work plan and task completed for each month starting from May 2014. | ||
− | == | + | == Shrad's Work plan for May 2014. == |
(1) Revision and submission of ERL manuscript | (1) Revision and submission of ERL manuscript | ||
(2) Revision and submission of HESS manuscript (up to 2 weeks of work) | (2) Revision and submission of HESS manuscript (up to 2 weeks of work) | ||
− | (3) GEWEX presentation work | + | (3) [[GEWEX presentation work]] |
(a) Rerun VIC model with CHIRPS 1.8 | (a) Rerun VIC model with CHIRPS 1.8 | ||
− | + | (b) Generate seasonal climate scenarios using NMME | |
(4) Get familiarized with knot and LIS, and install LIS on knot for future FLDAS simulations | (4) Get familiarized with knot and LIS, and install LIS on knot for future FLDAS simulations | ||
− | == | + | == Shrad's Work plan for June 2014. == |
− | (1) GEWEX presentation work | + | (1) GEWEX presentation work |
(a) Implement data assimilation using microwave soil moisture (and/or SMAP) in East Africa Hydrologic forecast system and evaluation | (a) Implement data assimilation using microwave soil moisture (and/or SMAP) in East Africa Hydrologic forecast system and evaluation | ||
− | (2) Hydrologic sensitivity experiments for greater horn of Africa using VIC model and preferably with NOAH and Catchment/CLM models as well. | + | (2) Hydrologic sensitivity experiments for greater horn of Africa using VIC model and preferably with NOAH and Catchment/CLM models as well. |
Latest revision as of 12:11, 15 May 2014
This page lists Shrad's work plan and task completed for each month starting from May 2014.
Shrad's Work plan for May 2014.
(1) Revision and submission of ERL manuscript (2) Revision and submission of HESS manuscript (up to 2 weeks of work) (3) GEWEX presentation work (a) Rerun VIC model with CHIRPS 1.8 (b) Generate seasonal climate scenarios using NMME (4) Get familiarized with knot and LIS, and install LIS on knot for future FLDAS simulations
Shrad's Work plan for June 2014.
(1) GEWEX presentation work (a) Implement data assimilation using microwave soil moisture (and/or SMAP) in East Africa Hydrologic forecast system and evaluation (2) Hydrologic sensitivity experiments for greater horn of Africa using VIC model and preferably with NOAH and Catchment/CLM models as well.